u prilogu primer,
pokusacu da objasnim ukratko.
ima 5 kolona
POČETAK 60 DOKUMENT 1 DOKUMENT 2 POČETAK 2
treba izracunati period od 60 dana
*UKOLIKO 60 DAN PADA NA NEDELJU, SUBOTU ILI PETAK ILI NA NERADNI DAN, TREBA DA SE VRATI NA ČETVRTAK
* UKOLIKO 60 DAN PADA NA PONEDELJAK, UTORAK, SREDU ILI ČETVRTAK OSTAJE TAJ DAN
* KAKO REŠITI NE RADNE DANE VERSKE I DRŽAVNE
**DOKUMENT 1 I DOKUMENT 2 IDE NA DAN KADA JE 60 DAN
***POČETAK 2 IDE NA DAN POSLE DOKUMENTA 1 I DOKUMENTA 2
*** REZULTAT POČETKA 2 PRELAZI U SLEDEĆI RED KOLONE POČETKA